In the second phase of our building project, significant progress was made with the casting of the first-floor slab and laying the structural foundation for the upper-level classrooms. This stage involved the installation of formwork, reinforcement, and concrete pouring to ensure a solid and durable floor structure. Following the slab work, we began the partitioning of classrooms, setting up internal walls to define learning spaces. These divisions are designed to promote effective learning environments with optimal ventilation and natural lighting.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore More

August 2021- December 2021

In the middle of August, the painting began. There were still some windows and doors not finished yet. The plumbing was also behind and a lot of other things were

September 2024 – December 2025

In the second phase of our building project, we are expanding upwards to construct fully equipped classrooms on the first floor. This phase includes the development of additional learning spaces

June 2021- August 2021

Windows and door frames were fixed properly and the plastering continued. The electric wires were being installed and the switches were fixed. more wood was purchased and some adjustments were