January 2025 – March 2025

January 1, 2025 0 Comments 0 tags

In the second phase of our building project, significant progress was made with the casting of the first-floor slab and laying the structural foundation for the upper-level classrooms. This stage

September 2024 – December 2025

November 8, 2024 0 Comments 0 tags

In the second phase of our building project, we are expanding upwards to construct fully equipped classrooms on the first floor. This phase includes the development of additional learning spaces

August 2021- December 2021

April 11, 2022 0 Comments 0 tags

In the middle of August, the painting began. There were still some windows and doors not finished yet. The plumbing was also behind and a lot of other things were

June 2021- August 2021

April 9, 2022 0 Comments 0 tags

Windows and door frames were fixed properly and the plastering continued. The electric wires were being installed and the switches were fixed. more wood was purchased and some adjustments were

2020/2021 Progress

May 18, 2021 0 Comments 0 tags

At the beginning of 2020, there was a scheduled time to be followed before the casting of the first-floor slab. The corona pandemic delayed the process due to lockdown, which

2019 Progress

March 11, 2021 0 Comments 0 tags

In 2019, the foundation commenced a school building project called Jan Montessori School which is located at Oyibi, a town on the outskirts of Accra, Ghana about 30 km North

A Little Goes A Long Way

March 11, 2021 0 Comments 0 tags

Here at Crown Jan Foundation, we strive to give every child access to quality education and potential in order to live a fulfilled life. As we believe that the key

Welcome to Crown Jan Foundation

March 4, 2021 0 Comments 0 tags